Renovating an HDB flat in Singapore involves more than choosing a new layout, materials and interior style. Homeowners and renovation contractors also need to follow the relevant HDB renovation guidelines covering permitted works, approval requirements, working hours and other renovation restrictions.
Understanding these requirements before renovation begins can help you avoid unnecessary delays, unauthorised works and costly rectification later on.
This guide covers the key HDB renovation rules homeowners should know before starting renovation works.
Plan Your Design and Budget
The best way to start is to develop a comprehensive plan for what you want from the renovation project and your budget. You must carefully consider managing your available funding and spreading it across the entire project, from hiring contractors to choosing the right materials. You may find good deals that help you save without sacrificing overall quality.
Research is your best friend when it comes to managing your renovation plans. Besides materials and contractors, you need to look for design inspiration and financing options, check out labour rates, and determine whether other factors can influence overall renovation costs. As you do this, you can use the information you find to inform your design plans and modify it as needed. This early advantage ensures you can stay on top of things and adjust your budget and plans from start to finish.
Common Renovation Works That May Be Allowed
Depending on the specific work and applicable HDB requirements, common renovation works may include:
- Painting and wall finishes
- Built-in carpentry and storage
- Kitchen cabinets and wardrobes
- Replacement of certain floor finishes
- Electrical and lighting works
- Plumbing and sanitary works
- Installation or replacement of certain doors and grilles
- Air-conditioning installation
Even where a renovation permit is not required, the work must still comply with the relevant HDB guidelines and technical requirements.
Renovation Works That Are Not Allowed
HDB does not allow renovation works that may compromise the building’s structural integrity, affect common property or create safety risks.
Examples may include:
- Unauthorised hacking or alteration of structural elements
- Alterations that weaken or overload the building structure
- Unapproved changes to the building’s external façade
- Renovation works that create fire or public safety hazards
- Encroachment into common or public areas
- Unauthorised alterations that do not comply with HDB requirements
If you are unsure whether a proposed renovation is permitted, check the latest HDB requirements before work begins.
Hire a Licensed Professional
HDB flat owners are required to engage a renovation contractor listed in HDB’s Directory of Renovation Contractors for applicable renovation works.
Contractors listed in the directory are familiar with HDB renovation requirements. However, homeowners should still review their experience, previous projects, quotation and scope of work before making an appointment.
Certain specialised renovation works may also need to be carried out by appropriately qualified or licensed professionals.
| Type of Work | Contractor / Professional |
| General HDB renovation | Contractor listed in HDB’s Directory of Renovation Contractors (DRC) |
| Water service and sanitary works | PUB-licensed plumbing professional |
| Gas service works | Licensed gas service professional |
| Electrical works | EMA Licensed Electrical Worker |
| Window installation or replacement | Approved window contractor |
| Air-conditioning installation | BCA-trained air-conditioner installer |
| Works requiring structural certification or supervision | Qualified Person (QP) or Professional Engineer (PE), where required |
Ensure you and the contractor agree on the contract outlining both parties’ responsibilities throughout the project. Clear communication between both parties is essential to ensure the project’s completion with minimal difficulties.
Scheduling Renovation Work
Carefully plan a work schedule that ensures maximum work efficiency and minimal downtime caused by sudden or unexpected delays. Discuss this with your contractors to see how you can prepare the renovation of specific elements or areas of your home and ensure that other work is not significantly disrupted. Again, clear and effective communication will ensure everyone is on the same page to avoid complications.
It may be a good idea to break down the project into smaller, manageable phases that give a clear roadmap towards completion. You can start with specific areas and work step-by-step to cover the entire home to completion while staying within the stipulated schedule.
Submit Relevant Applications
Some aspects of your home require a permit from HDB (or other relevant authorities) before you can renovate them. That especially applies to demolishing any non-load-bearing reinforced concrete walls in your home. This requisite aims to protect the well-being of the residents of your HDB flat by ensuring you do not remove anything that jeopardises the building’s structural integrity. You can view HDB’s requirements in detail on their website.
Your contractor will also need to submit an online renovation application to the HDB, including an acknowledgement form signed by you as the flat owner. Once submitted, you should receive an SMS notification and can check the permit application status via your My HDBPage e-service. After you receive the relevant permits, you can finally start renovation work.
The HDB will also conduct occasional checks to ensure compliance with its guidelines and regulations. Ensure your contractor performs their tasks per HDB requirements and that materials are high quality, or you could face hefty fines or other action(s) against you.
Inform Your Neighbours
Be considerate and let your neighbours know about your renovation plans early. Giving them a heads-up will ensure you can maintain good ties with them and allow them to plan around the disruptive renovations. Also, ensure that your contractor places the Notice of Renovation outside your home and displays it until the project’s completion.
Note that general renovation work can only be performed from Monday to Saturday from 9 a.m. to 6 p.m. Noisier renovation work is restricted to Monday to Friday from 9 a.m. to 5 p.m. You cannot perform any work on Sundays and public holidays (weekends, public holidays, and the eve of major public holidays for noisy work), so plan accordingly.
Proper Disposal
Renovations generate much waste, so ensure you dispose of it properly so that it does not become a safety hazard to yourself and others. Ensure that renovation staff do their part by carefully discarding waste into the proper garbage receptacles, avoiding flushing debris down the sewage system, and not throwing large items into the refuse chute that can damage its functionality.
Homeowners should ensure their renovation contractor avoids:
- Disposing of renovation debris through the refuse chute
- Flushing cement or construction materials into sanitary systems
- Leaving renovation waste along common corridors
- Blocking shared access areas with materials or debris
- Allowing debris to accumulate around common property
Unexpected Events
Even the best-laid plans will eventually run into problems. As such, it helps to be cautious of unforeseen circumstances that may arise without warning and do what you can to remedy the situation. Be sure to maintain constant, friendly communication with your contractors and suppliers to minimise delays and other issues; you can also ensure they will do their best to support you however they can. Stay calm, and you can deal with the problem promptly and without difficulties later on.
Niche Koncept can also help you make your dream living space a reality. With our years of experience, we can help you execute your design ideas and ensure your project goes smoothly. We are happy to help you visualise your interior design vision and provide assistance and advice to make your dream home come true. Contact us today, and we can Design Your Perfect Space together!
Frequently Asked Questions
Do I need HDB approval for all renovation works?
No. Some renovation works may be carried out without an HDB permit provided they comply with the applicable technical guidelines. However, certain works require prior approval before renovation can begin.
What are the HDB renovation working hours in Singapore?
General renovation works are typically allowed from 9:00 AM to 6:00 PM from Monday to Saturday. Renovation work is not allowed on Sundays and Public Holidays.
Noisy works such as hacking, demolition, tile cutting and heavy drilling are subject to stricter working-hour restrictions.
Which HDB renovation works are strictly not allowed?
Works that compromise structural integrity, affect common property, alter restricted building elements or create safety hazards are generally not allowed.
Always check the applicable HDB guidelines before carrying out significant alterations.
What happens if I renovate without HDB approval?
If the renovation requires approval but work begins without it, the renovation may be treated as unauthorised. The homeowner may be required to rectify or remove the affected works, and further enforcement action may be taken where necessary.
Do I need to inform HDB before starting renovation?
For renovation works that require a permit, approval must be obtained before work starts. Your renovation contractor will generally submit the relevant application and supporting documents.
Even where a permit is not required, the renovation must still comply with HDB’s applicable guidelines.